Wednesday, February 16, 2011

Reliability and feasibility of home improvement of supervision!

 Shou Fang, home inspection, budget review, renovation supervision, decoration company strength verification, housekeeping services, consulting services, renovation, decoration engineering, construction engineering cost consulting, bidding agent services. For professional services to create the first brand of the Commissioner of the Northwest decoration. ensure the quality, cost savings, improve renovation cost, by creating value for customers to realize their value. four provinces, one safeguard: when a province: from us to help you view the site, you can rest assured that work, recreation and rest; Second effort: a Professional supervision company to help you examine all materials, you do not run around looking for building materials market; provinces heart: a Management Company team of professionals at your service, you do not upset to learn the complex decoration of knowledge; four to save money: stop home improvement company in the project overestimated the gross count, cut corners, save you unnecessary expenses. guarantee the quality of decoration: the entire supervision of the construction quality, control engineering period. decoration project supervision program: Supervision of content: According to our experience, decoration project includes the following projects: 1. decoration part project includes the following sub-project: 1.1 The ground floor of cement mortar; 1.2 1.3 ceramic tile floor, marble floor, granite floor, ground; 1.4 solid wood flooring; 1.5 parquet; 1.6 Bamboo floor; 1.7 General plastering; 1.8 decorative plaster; 1.9 production and installation of wood windows and doors; 1.10 metal doors and windows; 1.11 steel doors and windows; 1.12 special doors and windows; 1.13 glass bomb doors installed; 1.14 out keel ceiling; 1.15 dark keel ceiling; 1.16 light partition; 1.17 activity wall; 1.18 glass partition; 1.19 veneer (ceramic tile or stone) installation; 1.20 Tile paste; 1.21 water-based (latex paint) coating; 1.22 solvent-based coating (paint) finishing; 1.23 wall paper, soft pack; 1.24 cabinet making and installation; 1.25 Chuanglian production and installation; 1.26 windowsill board production and installation; 1.27 Heating cover production and installation; 128 sets of production and installation of windows and doors; 1.29 Guardrail, handrail fabrication and installation; 1.30 floral production and installation ; 1.31 production and installation of stairs; 1.32 membrane, waterproof coating layer, .2. to the drainage and heating part project includes the following sub-project: 2.1, drainage Road Reconstruction; 2.2 installed water pipes and fittings; 2.3 Water Supply Equipment Installation ; 2.4 feed water pipe corrosion, thermal insulation; 2.5 install drain pipes and fittings; 2.6 hot water supply system piping and fittings installed; 2.7 water pipeline corrosion, thermal insulation; 2.8 Health equipment installation; 2.9 parts water sanitation equipment installation; 2.10 drainage fittings for sanitary appliances pipeline installation; 2.11 heating system renovation; 2.12 heating pipes and radiators installation .3. Electrical Division Project contains the following sub-project: 3.1 electrical transformation; 3.2 line pipe, groove laying; 3.3 wire and cable laying; 3.4 lines connection; 3.5 switch, socket; 3.6 general lighting installation; 3.7 architectural lighting power pilot; 3.8 weak system of communication lines, network lines, closed circuit television, building intercom system shift, the terminal connector and socket and so on. II . Commissioner goal 1. project quality control objectives: quality of the project were all qualified, 95% owner satisfaction with the quality of some projects to achieve good .2. the progress of control objectives: to eliminate the construction unit and the supervision unit is not due to schedule delays due diligence to ensure the project on schedule hand over .3. project investment control objectives: the project does not change the situation does not change the grade of the decoration does not break under the project budget .4. security control objectives: the safety of people during construction to prevent accidents. Third, the supervision authority: Specification documents. four, tooling Supervision points: 1. the establishment of the Project Supervision Department, the supervisor or a chief supervision engineer on behalf of a chief supervision engineer, the decoration of two supervising engineers, water, electricity and heating engineer a comprehensive supervision, supervision member, data member name of a total of six supervisors .2. and the owners (agents) signed a commission contract engineering supervision .3. convening of the first site meeting, the meeting includes the following main elements: a landlord, construction and supervision units units respectively introduced their site organization, and their division of labor; b owners under the Supervision Contract, announced the authorization of the chief supervision engineer; c owners about groundbreaking cases; d unit describes the construction preparations for the construction; e chief engineer describes the work of the Commissioner of Main content; f study identifies the parties to participate in the construction site during the regular meeting of the principal officers of the regular meeting held in the period the site, location and major issues .4. earnestly advance engineering quality control. engineering the main material used must first inspection, needs re-examination of the material, supervision personnel must witness sampling, tracking submission .5. to find the key process engineering, construction technology and key parts of measures to ensure the quality of the project and construction scheme, to the supervising teacher to sign and acknowledge. new materials, new processes, application of new technologies, require the construction units to submit relevant documents or process measures, where necessary, special demonstration, sign and acknowledge before the implementation of .6. engineering quality things in control, each sub-project construction inspection according to the procedure to do , after acceptance process before the next one. For no inspection of the hidden works, the construction side concealed themselves require exhumation of the construction unit, in accordance with the test specification doubles the number of tests and found that a failure to require all construction units rework , its costs and schedule delays of responsibility borne by the construction of .7. supervisors adhere to the inspection of the construction site, key positions, the key processes of the construction next to valet station. Supervision found that quality defects occur during the construction, supervision time and issued an oral warning notice requires rectification, construction of major quality problems that may lead to quality has caused an accident or incident, should be issued by the chief supervision engineer suspension order requiring the construction unit suspension for rectification, the rectification is completed inspection by supervisors, in line with the design and quality acceptance requirements, be issued by the chief supervision engineers return to work order. suspend the work or the resumption of work shall inform the owners .8. deviate from the schedule progress of the project, it is necessary to take timely corrective measures to prevent schedule delays. If the reasons for non-construction units, so that the project is not scheduled to report on progress to the owners in a timely manner, the prevention by the owner or supervision unit and other causes of schedule delays and cost of claims .9. carefully validated the reasonableness of engineering change and the need to review engineering change budget, strict cost of engineering change control .10. assist the owners, the construction unit manage construction safety. construction is completed, in accordance with relevant laws and regulations, construction drawings and other documents on the acceptance of the works have been completed, problems to urge the construction unit rectification. Project Supervision and the kind of information should be completed in a comprehensive inspection, after passing the final acceptance signed by the chief supervision engineer a single, oral or written notice to the owners of project quality situation. In some of the remaining time of final acceptance or defect engineering works, without affecting the delivery of circumstances, the owner, design unit, construction units and supervision, in consultation, by the construction of the unit after the final acceptance deadline for correction. After the completion of the project delivery, engineering supervision unit to regularly visit, that reveal the quality of engineering problems, promptly notify construction unit for maintenance. simple decoration in general acceptance from the five aspects, namely: water, electricity, tile, wood, oil. (1) wire, cable, switches, electrical outlets should have a national product safety certification. Concealed wires must be wear, sleeves must be fire-retardant materials, wall panels, and junction box nozzle should be smooth, no glitches, there should not be folded flat shape cracks. shall not be directly buried in walls or floating wire resting on the ceiling. wires in tube may not have connections and kink. (2) After laying the ground circuit should be placed on both sides of the square wood sheathing, or cement mortar to do slope protection, construction workers to prevent broken foot when walking. ceiling should be fixed within the lines 5cm from the ceiling in place. (3) the strength of electrical wiring distance should be 50cm or more. more not wear in a tube. (4) wire and heating, hot water, gas pipes not less than the distance between the parallel 30cm, cross- spacing of not less than the time of 10cm. (5) Concealed into the wall and the pipes should be embalmed. (6) to, installation of drain pipes should be smooth vertical and horizontal, solid and not loose, should be filled into the wall to the Cement mortar protection, protective layer thickness of 1-1.5cm. (7) hot and cold water mains parallel distance of not less than 20cm. (8) pipelines and sanitary ware, valves and other connections to tight no leaks, pressure test after passing the construction process can proceed to the next. (9) Kitchen, bathroom and other surface drainage water space should be smooth, about 2% of ground slope to drain to the direction of tilt, there are attempts to prevent the nozzle measures to ensure the smooth water without clogging up and down .1, bricklayer : including ceramic tile (wet paste, dry paste), Stone (wet paste, hanging) acceptance. (1) whether the brick Euparagonimus, no tilt; (2) whether there are broken tile chipping phenomenon; (3) tile gap is structured the same. (4) toilet, balcony and kitchen with floor drain tiles have enough self-drainage gradient; (5) Tile direction is correct, there is no reversal; (6) tiles and waist location is correct, there is no deviation or high error phenomenon. (7) flatness, squareness, level of difference. (8) the hollowing of not more than 5%. (9) .2 no color, wood: including doors, windows, ceiling , cabinets, wall base, heating cover, the floor of the inspection. According to the requirements. Solid wood frame structure should be assembled. cupboard surface should be sanded smooth, no glitches or hammer marks. veneer materials used, should be firmly pasted flat, do not come unglued, the corner office does not Qiqiao. cabinet table should be smooth. cupboard Doors and drawers should be installed securely, switching and flexible, with the bottom edge of the position under the parallel port. b, accessories should be complete, firmly installed correctly. c, cabinet and method of inspection should be carried out in Table 1. Details: www.sxzhjl.com (original post:

No comments:

Post a Comment